Loading...

Delay Cost that You Do not Want to Account for in Construction


In businesses, construction projects show signs of growth and opportunity. Gradually, the construction can also lead to displacement, downtime, and postponements. These aspects may prove extremely costly for any business. Due to these factors, businesses may stop to progress. Labor is one of the biggest factors in causing constriction delays.

Some of the construction experts comment that the size of the project is the main leading factor that causes deferment. Yet, there can be any factor of delay. The budget can only be gauged with the size and scope of the project.

Other factors of delay include unfavorable environmental condition, payment failures, and equipment transportation. To avoid these interruptions, businesses hire delay expert as management consultants.

Delay Cost that You Don’t Want to Account for in Construction

As the budget calculations are left out, delay starts to occur. This postponement is the potential cause of outweighing the cost in a project.

Potential Effect of Delays that can cost your construction projects

Postponements are demotivating and frustrating, both for the workers and supervisors. Supervisors usually try to get the work done without any delay. When the work is gradually carried out later, it is difficult to get back the productivity and motivation of the employees.

The contractor, in turn, has to pay the client for the penalties and enforced postponements. In addition, they have to incur the entire cost of delay along with the reputation and damages. 

Why should we avoid delay?

The delay can have many consequences. All of these consequences lead to impart additional costs of the following:

  • Delaying in sub-contractors’ tasks.
  • Disturbance in cash flow as the ending date extends and the release of securities and monies is deferred.
  • Storage of construction material because of the unavailability of the site specification. It results in the additional cost of storage and handling.
  • Risk of construction material damage during storage.
  • The extra cost of mobilization for the personnel, subcontractors, and specialist equipment for work continuity.
  • Increase in the prices of materials.
  • Unproductive and inefficient use of equipment and personnel.
  • The overhead cost of equipment for extended deadlines.
  • The extension costs of insurances, sureties, and construction bonds.
  • Salaries of the supervisory staff and management.
  • The associated cost of the site facilities for engineers and supervisory staff.

Responsibilities of a construction consultant

A construction management consultant coordinates the entire process, which ensures the timely delivery of all the items, including labor. They maintain a summary book having all the materials listed that are to be used in a day.

The consultants are different from the normal builders in the sense that they are more skillful. The consultant studies a project thoroughly and then evaluates it. This evaluation comprises both the physical and financial feasibility, which is accomplished using a Detailed Feasibility Report (DFR).

The above-listed costs cannot be demonstrated to the clients. Therefore, here comes the responsibility of a construction consultant. The construction companies do whatever it takes to make sure that the project continues according to the requirements. The best way in this regard is to seek assistance from professional witnesses of delay experts for dealing with arguments and disputes.

Bottom line:

Construction consultants design the existing projects in engineering pattern as well, so that the delays and failures can be minimized. They can ensure operational skills by using their technical skills which are required for the management of every construction project.

Don’t forget to consider the experience of witness delay professionals in the relevant field to avoid inconvenience.